Villa G's Travels and Villa Cengkeh Bali

Wednesday, February 24, 2016

Construction 15: Cabinets and Floor Tiles

Today we had a visit to the workshop where all the doors, cabinets, tables, wardrobes and beds are being handmade.  It is only 20 minutes drive from Villa Cengkeh.  Most pieces are being made from plantation grown teak and will be finished only with oil.  The kitchen cabinets will be painted grey/white.

L to R: Kadek the furniture craftsman,
Roland the contractor and Susan reviewing
cabinet plans for kitchen
Unfished teak wardrobes


Foreground: teak doors, background: teak guest bed.
Many things are happening onsite.  Laying of the floor tiles has begun.  The dropped ceilings for the air conditioned spaces is being installed.  Wall tiles continue in the bathroom.  The roofs final decorative details are being finished.
Guest bedroom ceramic tile being laid down

3.75 meter high "dropped" ceiling for master bedroom

Balinese detail in the roof construction

Veranda for master bedroom and study.  This will all be terracotta tiles

No comments:

Post a Comment