There has not been any rain which has been good for the construction progress. Once the pool concrete is poured, then the remaining villa foundation can be made and the pillars for the roof over the verandah put up. The roof would then follow. So November is a crucial month. If the rain holds off for another month that would be good for the construction; of course, that is up to mother nature.
Entrance ot the driveway |
Driveway looking toward the entrance |
Driveway with walks to house on right |
Looking over pool to master bedroom and study |
Pool ready for pouring concrete |
The entrance door from inside looking out to the east |
A bar counter will go on top of these brick walls |
Carpenters |
Steps from the carpark down to the well and water storage area |